Case study 03 — Risk

US Construction Overruns & PERE Risk Matrix

Institutional Analysis of GC Inefficiencies, Labor Volatility & Capital Destruction

High alert 28% Average Overrun 2026 labor deficit 499k Global Annual Inefficiency $1.6 Trillion US Overrun Frequency 90% of Projects Construction Bankruptcies +28% YoY Effective Work Yield 49 Mins / Hour Oceanwide Equity Destruction -60% Capital

13% of Global GDP Average 28% Cost Drift 4,280 Filings (2025-2026) PI drops to 0.82 late in site $700M+ Evaporated in LA

All case studies

01 — Executive overview

The Systemic US Construction Capital Destruction Crisis

The US construction industry is trapped in a structural productivity crisis that poses severe threats to Private Equity Real Estate (PERE) investment funds. Operating on tight net profit margins historically between 3% and 7%, construction projects routinely experience massive capital erosion. Nine out of ten US construction projects exceed their initial budget, with an average overrun of 28%. A minor budget drift of just 3% is often sufficient to wipe out the entire operational margin of a project.

Project Scale vs. Budget Drift & Schedule Extensions

McKinsey Global Institute data showing how overrun severity scales non-linearly with project size.

McKinsey / CII Data

Key Insight: Mega-projects (>$100M) display catastrophic failure rates: 98% suffer cost overruns >30%, and 77% experience schedule delays exceeding 40%.

01

Estimating & Low-Balling Practices

32% of overruns stem directly from inaccurate initial estimates. Contractors intentionally underbid tenders ("low-balling") to win bids, planning to recoup margins via change order manipulation later.

02

The Illusion of GMP Contracts

Guaranteed Maximum Price (AIA A133) contracts fail to shield funds. Contractors pierce ceilings through allowance manipulation, unforeseen condition claims, and material escalation clauses.

03

Trust Fund Defalcation & Liens

Cash-starved GCs illegally divert project funds ("robbing Peter to pay Paul"). Subcontractors respond by encumbering property titles with mechanic's liens, creating clouds on title and asset freezes.

This case study is illustrative research prepared for discussion. It is not an offer or solicitation, and it is not investment advice. Figures, ratings, yields and facility terms are the author's analysis or targets; they are unaudited and have not been achieved. Any securities activity is conducted only with qualified institutional buyers, under available exemptions, and through definitive documentation.

Data sources: McKinsey Global Institute, Construction Industry Institute (CII), ASCE, Associated Builders & Contractors (ABC), ABI, Epiq AACER.